Timelines
How long does foundation repair take? What your quote should say
Homeowners ask this as one question. On paper it is five, and a good quote answers most of them before you sign. A quote that is silent on timing leaves you scheduling your life around a job you cannot plan.
The five clocks
- Scheduling: how many weeks between signing and the crew arriving? Get the expected start window in writing.
- Permits and engineering: if the job needs a permit or an engineer letter, who files it and how long does it typically hold the start?
- The work itself: exterior pier jobs are often quoted in days, interior work adds breakout, patching, and flooring time. The quote should state the estimated days on site.
- After the lift: plumbing tests, retests if a line fails, and any cure or settling period before cosmetic repairs. Ask what is included and what a failed test costs.
- Overruns: what happens if the job runs long or the scope grows? The change order rate and the approval process should already be in the document.
Why this belongs in a quote comparison
Two quotes can price the same piers and describe very different months. A cheaper quote with no start window, no retest coverage, and an open ended change order clause can cost more in time and surprises than the higher quote that commits in writing. When you compare, compare the clocks alongside the dollars.
What this service is, and is not
Foundation Quote Decoder compares the documents you already have. We do not inspect homes, diagnose foundations, recommend a scope of work, or tell you which contractor to hire, and nothing here is engineering advice. Use the comparison to ask sharper questions and, where the stakes warrant it, consult a licensed structural engineer.
Bring us the actual quotes
Free: send one quote for a check against the 12 point list. Paid, $129 flat: send two or more quotes for the full line by line teardown, delivered within 48 hours of complete documents.